Documents

  • Technical Design of the Crown Road; Volume Mass Calculation

  • (Final Report) Crown Road Auroville: General Technical Design Study & Hydraulic Verification of the entire Crown Road

  • Discussion on the “Technical Study of the Crown by Aqua Engineer’s”

  • L’avenir/TDC Report to the Governing Board

  • MM Lake and Pump Storage Hill: Test Pumps

  • Example of Issues to be Handled by Auroville’s Planners

  • Wouldn’t it be Great if?

  • MAP: Existing Land Use Pattern

  • MAP: Auroville International Zone, 2012

  • MAP: Auroville Industrial Zone, Existing Land Use

    ,