Documents

  • Gilles’ Proposed Brief for L’avenir’s Water Supply

  • Gilles’ Proposed Brief for L’avenir’s Energy Supply

  • On the 3 Main Concepts Proposed for the Matrimandir Lake

  • Note for ATDC about AV MP Land Use Regulations Options

  • Technical Design of the Crown Road; Volume Mass Calculation

  • (Final Report) Crown Road Auroville: General Technical Design Study & Hydraulic Verification of the entire Crown Road

  • Discussion on the “Technical Study of the Crown by Aqua Engineer’s”

  • L’avenir/TDC Report to the Governing Board

  • MM Lake and Pump Storage Hill: Test Pumps

  • Example of Issues to be Handled by Auroville’s Planners